On September 14, 2024, a successful no-load test was done to our first ultra high-temperature and ultra high-pressure steam turbine unit in our factory! Our team tested the steam turbine speed from its initial static state to an overspeed test.
Overall, the steam turbine runs steadily with key indicators from the shaft vibration, shaft bush temperature, axial displacement, etc. reaching the design standard.
Model: C12.5-12.5/0.69

Search from here
Leave a message